Retail Store – Brea Mall
2011 Sq. Ft.- Remodel
Location: Brea, CA 92821
Bids Due: 03/28/22Â
Trades: Demolition, Doors / Frames / Hardware, Drywall / FRP, Electrical, Final Clean, Finish Carpentry / Millwork / Fixturing, Fire Alarm, Fire Sprinkler, Flooring (Includes VCT, Tile), Glass / Mirrors / Storefront / Windows, HVAC, Insulation, Joint Sealer, Lockers, Voice & Data, Painting / Wall Covering, Plumbing, Roofing, Saw Cutting & Concrete Pour Back, Toilet Accessories, Waterproofing
All proposals should be sent to LLaGarce@ELS-construction.com.
Should you have any questions, please contact:
Lindsey LaGarce
Estimating Coordinator / ELS Construction
Address: 1100 Nasa Parkway, Ste. 650 Houston, TX 77058
Email: LLaGarce@ELS-construction.com (Email is the preferred method of contact)
Office: 281-324-0701 Fax: 281-966-6969
Website:
Register to Stay Updated on Future Bid Opportunities for San Bernardino Community College District
PLA Projects – Opportunities for Local, Minority, Woman and Veteran-Owned Businesses
Trades: Roofing, Painting, Electrical, Plumbing, Concrete, Furniture, Landscaping, HVAC, Fire & Safety Alarms, and more…
Should you have any questions, please contact:
Ynez Canela
Local Business Outreach Administrator
San Bernardino Community College District
Phone: (909) 381-8427
Email: ycanela@sbccd.com
Go to
Posted on: March 15, 2022
Veterinary Emergency Group
Alterations / Renovations Medical Office Project
Location: 2700 Wilshire Blvd, Santa Monica, CA 90403
Bids Due: 01/17/2022 at 12:00 PM (PST)
Trades:Â Acoustical Ceilings, Appliances, Blinds, Concrete Flooring (Includes Epoxy), Demolition, Doors / Frames / Hardware, Drywall / FRP, Electrical, Final Clean, Finish Carpentry / Millwork / Fixturing, Fire Alarm, Fire Sprinkler, Flooring (Includes VCT, Carpet, Tile), Glass / Mirrors / Storefront / Windows, HVAC, Lockers, Painting / Wall Covering, Plumbing, Saw Cutting & Concrete Pour Back, Signs, Toilet Accessories / Specialties, Waterproofing, Wood Framing / Rough Carpentry
Square Feet: 5,580
All proposals should be sent to LLaGarce@ELS-construction.com
Should you have any questions, please contact:
Lindsey LaGarce
Email – llagarce@els-construction.com
Phone- (281)324-0701
Posted on: January 4, 2022
The Omega – South Coast Plaza (Tenant Improvements – Retail Store)
Location: Costa Mesa, California
Bids Due: Wednesday, December 15th @ 2PM
ELS Construction are seeking subcontractors to bid The Omega – South Coast Plaza project.
Trades: Final Clean, Concrete- Pour back/Saw Cutting, Steel Fabrication, Rough Carpentry, Finish Carpentry, Millwork, Fixturing, Insulation- Need fireproofing, Glass- Glass & Mirrors, Storefront, Drywall, Ceiling, Flooring- Carpet/Vinyl/Ceramic Tile, Painting, Plumbing, Toilet Accessories, Appliances, Fire Extinguishers, HVAC, Electrical, Fire Alarm, Voice & Data, Audio & Visual.
Important Notes:
–DO NOT contact the architect or engineer. You will be disqualified as a bidder if you do.* ALL RFI’s go through ELS.
-All proposal submissions should include a copy of your company’s W-9. Failure to comply with this request may disqualify you from winning the project.
All proposals should be sent to LLaGarce@ELS-construction.com.
Should you have any questions, please contact:
Email – llagarce@els-construction.com
Phone- (281)324-0701
Posted on: December 8, 2021
Santa Ana Unified School District
Affiliated Craft Local Union covering: Project Areas of the Santa Ana Unified School District
Click here to view the Project Bid Letter.Â
Click here to view the Upcoming Bid Schedule.
Should you have any questions regarding this project, you may contact:
Ivonne Pittman
Administrative Secretary
Construction Department
714.480.5363 (ext. 75363)
Santa Ana Unified School District
1601 East Chestnut Avenue
Santa Ana, CA 92701-6322
Posted on: October 13, 2021
Updated: November 23, 2021
Midway Sanitary City District
Midway Sanitary City District in Westminster has partnered with the Building Trades Council in building their facilities. Estimated construction cost is $2.5M.
³¢´Ç³¦²¹³Ù¾±´Ç²Ô:ÌýWestminster, CA 92683
General Work Description:
-Interior Remodeling in the MCSD main office building, consisting of approximately 3,700 square feet
-Demolition of an existing 900 square foot out-building
-Demolition of an existing 3,400 square foot out-building
-Interior Demolition of an existing single-occupancy restroom and rework to storage room (Building C)
-Construction of a 3,800 square foot office addition to the existing main office (Building A)
-Construction of a new 940 square foot masonry Locker/Restroom building (Building B)
-Coordination and Installation of temporary office trailers (including utility connection) and relocation of office furnishings from the main building to the trailers
-Underground conduit from the main switchgear to future solar panel carport
-Installation of fire sprinklers in Buildings A and B
Contract Time- Time of completion for the Project shall be one hundred and five (240) calendar days established from the Notice to Proceed.
For project bid instructions, please click here.
Should you have any questions, please contact Richard J. Rengel from Rengel +Co Architects directly at 805-704-3663 or Council Representative Ernesto Medrano at (714) 651-7273.
Posted on: August 17, 2021